Alaska Highway Washout Repairs
South of Lower Post, BC
- $2.6 Million
- Project Owner: PWGSC
- Scope: Major washout of the Alaska Hwy, old culvert removed and disposed of. New pipe placed and welded. Fill material back up to highway elevation and place jersey barriers
- 146 metres of 2134mm Smooth wall culvert installation and welding
- 82,000m3 embankment cut to fill
- 12,000m3 clearing and grubbing